BNPP/ASB Functional Value of Biodiversity Project – Phase II 


General

Activity 1

Activity 2

Synthesis

Follow through


Download Technical Report for Activity 2 - [PDF: 16.6MB] [ZIP: 14.2MB] - See discussion  - See attachment list 

 Download Implementation Protocol for Activity 2 [ZIP: 1.70MB] [No appendices: 0.9 MB] - See discussion

Go to Datasets


1 Introduction

1.1 Goals and objectives

2 Specific implementation plan for activity 2

2.1 Roadmap -  set of hydrological models will be run in parallel across a nested set of ((sub)sub) catchments

2.2 Hydrological models 

2.3 Land use change scenarios

3 Application of the models in BNPP activities

UNIVERSITY OF WASHIGTON

3.1 Terms of reference:University of Washington

3.2 Strategy and Implementation

3.3 Data requirements and data availability for VIC, DHSVM and WBM

3.4 VIC applied to the Mekong Basin 

3.5 DHSVM applied to the Mae Chaem basin 

 

ICRAF SOUTHEAST ASIA 

3.6 GenRiver and SpatRain applied to Mae Chaem and Sumber Jaya

3.7 FALLOW applied to to Sumber Jaya

 

UNIVERSITY OF NEW HAMPSHIRE 

3.8 Central America meso-model

4 Scientific papers based on the above  

Appendices  

1.General background - shared with Activity 1

2.Links between Activity 1 and 2 and policybriefs - shared with Activity 1

3.Tables - Activity 2

4.Input parameters for SpatRain and GenRiver

5.Terminology used for watershed functions

6.Four steps for meso (and micro) scale models to clarify land use change effects on watershed functions

Attachments to Technical Report